Your Pre-Project Checklist

Considerations for your potential project. 

Anaerobic Digestion Project Checklist

There are a number of factors we take into consideration when starting to discuss any project.  The following is a brief list of items to discuss with your team to determine how ZWE and our technologies can best fit your needs.

 

What are your goals for the project? Is there any legislation, certifications, or benchmarks you are trying to fulfill?

As we plan your project, we can help you work toward these goals, but we need to know what they are so we incorporate them as thoroughly as possible.


How is the waste presently sorted? Is the organic (food and yard/agricultural) waste separated at the source or would this need to be done before going to the digester?

At ZWE, we have the ability to provide the appropriate level of MRF given your waste composition.


How much organic waste do you generate per year?

If you generate over 20,000 TPY of organic waste, your facility will benefit from our cast in place concrete SMARTFERM design. If less than that, it may be better suited for a pre-fabricated steel design.


Do you currently collect the garbage, including the organic waste?

We need to understand if you have control of the organic waste, or if you need to develop an agreement with waste providers.


What are the tipping fees and/or handling charges that are presently associated with this waste?

Disposal fee avoidance can be a significant driver of a need for an AD facility. However, there are many other mitigating factors, such as legislation, enhanced recovery, municipal requirements, contract requirements, fuel pricing, environmental-based incentives, etc., that may be driving the project.


Do you have a site identified for the AD system?

If you own the land this obviously helps the financial incentives. The smallest SMARTFERM requires 3,000 square feet for all equipment and scales up from there.


What will you do with the resulting digestate?

Do you have a compost partner or plan to finish the composting (drying) process yourself? Do you plan to sell it for agriculture use or use it as a soil amendment for landscaping?


Do you plan to operate the facility yourself?

ZWE provides facility management. We have the ability to develop facility operating processes and operational improvement strategies or to manage your facility under a full-service operating agreement; but we need to know if you would like to conduct these services so that we can include it in our proposal.


More from ZWE

BHS Names Thomas Brooks Chief Technology Officer

Eugene, Ore. – August 18, 2020 – – Bulk Handling Systems (BHS) has named Thomas Brooks to the position of Chief Technology Officer (CTO). Brooks assumes the role after serving as BHS’ Director of Technology and Product Development.

Read more

BHS to Build Advanced Recycling System in South Carolina

Moncks Corner, S.C. – January 30, 2018 – South Carolina-based RePower South (RPS) has begun construction of the Berkeley County Recycling and Recovery Facility, which will be the most advanced Mixed Waste Processing facility on the East Coast. The turnkey recovery system will be provided by Bulk Handling Systems (BHS)

Read more

Penn Waste Debuts Upgraded MRF

York, PA – November 1, 2017 – – Penn Waste is all systems go after adding new optical sorting and artificial intelligence (AI) technologies to the company’s state-of-the-art Single Stream Materials Recovery Facility (MRF) in York, Pennsylvania. Provided by Bulk Handling Systems (BHS)

Read more

Interview Video: South San Francisco Blue Line Biogenic CNG Facility

Interview with South San Francisco Scavenger Company / Blue Line Transfer Operations Manager Ron Fornesi. Processing more than 11,000 tons of organic waste, the Blue Line Biogenic CNG facility is the first project in US to convert food & green waste into low carbon CNG fuel.

Read more

SUEZ UK Opens Aberdeen Recycling Systems

Aberdeen, Scotland – October 24, 2017 – – SUEZ’s Recycling & Recovery UK Division recently started-up two new systems located at the Altens East Industrial Estate south of Aberdeen, Scotland. The turnkey Single Stream and Refuse Derived Fuel (RDF) systems provided by Bulk Handling Systems (BHS) process 20-tonnes-per-hour (tph)

Read more

BHS Announces Video Series

Eugene, Oregon – September 27, 2017 – – Bulk Handling Systems (BHS) has launched the BHS Value Series, a series of six videos that gives viewers an inside look into the real value-drivers behind a materials recovery facility (MRF) investment.

Read more

BHS Selected for Puente Hills MRF

LOS ANGELES – September 21, 2017 – – The Sanitation Districts of Los Angeles County (Districts) have selected Bulk Handling Systems (BHS) to design, manufacture and install a new materials recovery system at the Districts’ Puente Hills Materials Recovery Facility (PHMRF).

Read more

Turning Food Waste into Energy, CCTV America

The city of San Jose, California recently opened the largest dry fermentation anaerobic digestion facility in the world to change the definition of waste by putting it to good use. The facility was produced by Zero Waste Energy (ZWE). It’s nearly twice the size of an American football field. Read More.

Read more

ZWE Featured on Popular Science

American Energy Independence: Waste by PopSci

Read more